TOP KNIVES CATALOG
[gtranslate]

jackzheng@top-knives.com

+86 13926337483

WhatsApp: +86 13926337483

TOP KNIVES LLC logo TOP KNIVES LLC logo

TOP KNIVES LLC

TOP KNIVES LLC logo TOP KNIVES LLC logo

TOP KNIVES LLC

  • HOME
  • CATALOG
  • DESIGN HUB
    • KNIVES DESIGN
    • CATALOG
  • HOW WE WORK
  • CONTACT US
  • ABOUT US
  • FAQ
  • HOME
  • CATALOG
  • DESIGN HUB
    • KNIVES DESIGN
    • CATALOG
  • HOW WE WORK
  • CONTACT US
  • ABOUT US
  • FAQ
author-avatar yundic
0 comments
Wholesale Importer & Distributor Answers
November 14, 2026
14 Nov 2026

What should a TOP KNIVES buyer confirm when a drawing refers to a separate label file?

When a drawing only points to a separate label file, the buyer should confirm the exact file, revision and approval record before sampling or production.

Continue reading
author-avatar yundic
0 comments
Wholesale Importer & Distributor Answers
November 14, 2026
14 Nov 2026

How should a TOP KNIVES buyer flag a photo used only to show label placement?

A placement-only photo should be labelled by purpose, not treated as full label approval. Use a unique reference, state what it proves and what it does not, and keep text and colour proofs separate.

Continue reading
author-avatar yundic
0 comments
Wholesale Importer & Distributor Answers
November 14, 2026
14 Nov 2026

What should a TOP KNIVES buyer check when a sample order lists two recipients?

A practical check for wholesale buyers: identify the accepting recipient, separate notification contacts, and confirm the sample approval owner before the shipment leaves.

Continue reading
author-avatar yundic
0 comments
Wholesale Importer & Distributor Answers
November 14, 2026
14 Nov 2026

How should a TOP KNIVES buyer record a missing page in an inspection report?

A missing inspection report page is an evidence gap. Record the report ID, page and revision, mark the file incomplete, request the identified page from the official TOP KNIVES contact, and reconcile it before acceptance.

Continue reading
author-avatar yundic
0 comments
Wholesale Importer & Distributor Answers
November 14, 2026
14 Nov 2026

What should a TOP KNIVES buyer verify when a quote gives an alternative lead time?

When a quote offers an alternative lead time, the buyer should confirm which line changes, what condition activates it, when the clock starts, and which approvals or shipping steps are included.

Continue reading
author-avatar yundic
0 comments
Wholesale Importer & Distributor Answers
November 14, 2026
14 Nov 2026

How should a TOP KNIVES buyer record which sample uses temporary packing?

A practical record-keeping method for wholesale buyers: label temporary sample packing separately, attach evidence, name the sample version, and confirm the production packing reference with the official sample contact.

Continue reading
author-avatar yundic
0 comments
Wholesale Importer & Distributor Answers
November 14, 2026
14 Nov 2026

What should a TOP KNIVES buyer check if a sample request omits the intended carton finish?

A missing carton finish is a scope gap, not a cosmetic detail. Check the carton identity, surface wording, artwork reference, approval record and bulk-match statement before sample approval.

Continue reading
author-avatar yundic
0 comments
Wholesale Importer & Distributor Answers
November 14, 2026
14 Nov 2026

How can a TOP KNIVES buyer link a carton photo to a revised item code?

A carton photo is evidence, not an identifier. Build a crosswalk that pairs the photo with old and new codes, packaging revision, approved sample reference, and supplier confirmation.

Continue reading
author-avatar yundic
0 comments
Wholesale Importer & Distributor Answers
November 14, 2026
14 Nov 2026

What should a TOP KNIVES buyer confirm if a package proof has an extra language line?

A practical buyer checklist for handling an unexpected language line on a knife packaging proof: identify the source, confirm the panel, verify the translation and lock the approved version.

Continue reading
author-avatar yundic
0 comments
Wholesale Importer & Distributor Answers
November 14, 2026
14 Nov 2026

How should a TOP KNIVES buyer document an inspection checkpoint marked pending?

A pending inspection checkpoint is an open item, not a pass. Record the checkpoint, evidence still required, responsible contact, due date, and reviewer, then confirm close-out through the official TOP KNIVES LLC contact route.

Continue reading
  • «
  • ‹
  • 75
  • 76
  • 77
  • 78
  • 79
  • ›
  • »
  • HOME
  • CATALOG
  • DESIGN HUB
    • KNIVES DESIGN
    • CATALOG
  • HOW WE WORK
  • CONTACT US
  • ABOUT US
  • FAQ
WhatsApp Email