Buyer Question
How should a TOP KNIVES buyer document two approval emails attached to different proofs?
Two approval emails are not two loose messages. Treat each as evidence for one proof revision, record the attachment, scope and date, and confirm the mapping in writing before acting on either.
Treat each approval email as evidence for one proof revision, not as a general approval of the whole project. Record the proof identifier and revision, the email date and sender, the attachment name, what was approved, what was excluded, and whether the approval is still current. If the email does not identify the proof or the attached file, ask the sender to confirm the mapping in writing before you release production or packaging. When working with TOP KNIVES LLC, use the official contact route for case-specific confirmation and keep the approved proof or sample as the reference for the next step.
Direct answer
Document each approval email against the exact proof it covered. A useful record links four things in one place: the proof identifier and revision, the email that approved it, the attachment that was reviewed, and the scope of the approval. Do not treat two emails as one combined approval unless the written record says so. If either email is vague, ask the sender to confirm which proof file and revision it refers to before anyone acts on it.
Start with a proof register, not the inbox
Two approval emails attached to different proofs create a common record-keeping risk: the messages sit in an inbox, the proofs sit in a downloads folder, and later nobody can tell which file was approved by which message. Before production or packaging decisions move forward, create a simple approval register for the project. It can be a spreadsheet, a shared document or a table in the project folder. The format matters less than the discipline of keeping each approval tied to one proof revision.
Give each proof a clear identifier before you read the emails. For example, call one file “Proof A — packaging artwork” and the other “Proof B — label or insert layout,” using your own project names. Add the revision letter or number and the date the file was sent. Then open each approval email and match it to one row. If an email does not state the proof name, revision or attachment, do not guess from the subject line alone.
What to capture for each approval email
| Record field | What to write | Why it matters |
|---|---|---|
| Proof ID and revision | The exact file name, proof name, revision and date sent. | Prevents an older proof from being treated as the approved reference. |
| Approval email | Sender, recipient, date and time, subject line and message ID if available. | Makes the written approval traceable if the project folder is audited later. |
| Attachment check | The attachment name and whether it matches the proof register. | Confirms the email approved a file, not just a general idea. |
| Scope approved | What the sender approved: artwork, logo placement, packaging structure, label text, colour direction or another defined item. | Stops one approval from being stretched to cover something it did not address. |
| Exclusions or open points | Any item the email did not approve, left pending or asked to change. | Shows where a new proof or a new email is still needed. |
| Status | Current, superseded, pending confirmation or not approved. | Makes it clear which proof is the active reference. |
Store the original email as a PDF or exported message alongside the proof file. Keep the native proof file too. A screenshot of the email is better than nothing, but it may not show the attachment name or full message thread. If your team uses a shared drive, put both proofs and both emails in the same project folder and link to them from the register.
A two-email mapping check
When the two approval emails arrive, check them one at a time. For the first email, confirm that the attached file is Proof A and that the message approves the revision you intend to use. For the second email, confirm that the attached file is Proof B and that the message approves that separate item. Then ask a simple question: does either email claim to approve the other proof? If not, keep the approvals separate.
If the first email says “approved” but the attachment is missing, treat the record as incomplete and ask for the proof to be re-sent with the approval. If the second email replies to the first but changes a different file, do not assume the first approval has been replaced. The safe approach is to write back: “We read your first email as approval for Proof A, revision X, and your second email as approval for Proof B, revision Y. Please confirm, or correct the mapping.” This is an ordinary buyer confirmation step, not a claim that every supplier uses the same system.
Handle revisions and conflicts plainly
Revisions are where approval records usually break down. If Proof A is later revised, the earlier approval for Proof A becomes superseded for that proof. It does not automatically affect Proof B. If Proof B is revised but not re-approved, the old Proof B email remains evidence of the old revision only. Keep a “superseded” note in the register instead of deleting the old row. Deleting history makes it harder to explain why a later file was used.
If the two emails conflict, do not resolve the conflict from memory. Put the facts in a short message: proof name, revision, email date, what was approved and what remains open. Ask the supplier to confirm which file is the current reference. Where a proof has been replaced, request a new written approval for the replacement before production or packaging proceeds. This keeps the decision tied to the asset, not to a message thread alone.
TOP KNIVES LLC coordination
The public TOP KNIVES LLC pages describe sampling and approval planning as part of project coordination. The manufacturing page says sampling can align construction, finishes, branding, packaging and approval requirements within an agreed project plan, and that quality planning can cover incoming materials, in-process checks, assembly, consistency, packaging and final release. Those statements describe planning capability; they do not prove that a particular order passed a test or that a specific approval is complete.
The official contact page lists a samples and follow-up contact for sample status, approved sample references, packaging details, logo or customisation notes and order follow-up. It also reminds buyers that knife products face different laws, import rules, resale requirements, platform policies and age restrictions by destination, and that buyers are responsible for confirming whether a product can be legally imported, listed, sold or distributed. For a case-specific approval mapping, use the official contact route. For general process context, review the manufacturing and sampling coordination page.
A practical confirmation message can be short:
Subject: Confirmation of approval mapping for Proof A and Proof B
Hello, we are updating our project record. We understand your email dated [date] approves Proof A, revision [X], attached as [file name], and your email dated [date] approves Proof B, revision [Y], attached as [file name]. Please confirm whether this mapping is correct and whether either approval has been superseded. Please also confirm any item that was not approved or remains pending.
Keep the reply with the two original emails and the two proof files. If the supplier sends a corrected mapping, update the register and mark the earlier note as corrected rather than overwriting it. This gives the buyer a clear audit trail without pretending that email approval is the same as legal import clearance, product certification or a guarantee of production outcome.
Sources
- TOP KNIVES LLC company and manufacturing coordination — supports the company context and its description of development, sampling, packaging, quality control, logistics and production follow-up.
- TOP KNIVES Official Contact — supports the official inquiry route, samples and follow-up contact scope, and the buyer responsibility note on market rules.
- TOP KNIVES Manufacturing Capabilities — supports the description of sampling, approval checkpoints and quality planning as project-planning capabilities.
About this answer
Prepared with AI assistance from an approved source pack; publication is subject to deterministic editorial, canonical, sitemap, and security gates.
This is a process guide for wholesale buyers. It is not a SKU specification, legal approval, certification statement or guarantee of a particular order outcome.