Buyer Question
How should a TOP KNIVES buyer reference a superseded quantity when requesting a revised quotation?
A revised quotation request should separate the old quantity from the new one. Label the previous figure as a superseded quantity, state the revised quantity on its own line, and ask for a fresh quote rather than assuming the earlier price still applies.
In a revised quotation request, label the earlier figure as a superseded quantity and keep it separate from the new requested quantity. Use a clear format: 'Superseded quantity: 500 pcs – do not quote; revised requested quantity: 300 pcs – please quote this level.' Add the product reference, any prior RFQ or quotation number, the revision date, destination market, and packaging or customization notes that affect the quote. Ask TOP KNIVES LLC to confirm the revised quantity in the new quotation or PI, and do not treat the old quantity or old price as still active unless the revised document says so. The official contact page is the approved route for quotation support.
A revised quotation request works best when it reads like a controlled change record, not a chat message. The buyer should make the old figure historical and the new figure unmistakable.
Why a superseded quantity needs its own label
When a buyer changes a quantity, the quotation team may be working from a previous RFQ, price ladder, sample record, or draft PI. If the old and new numbers appear in the same sentence without labels, one number can be mistaken for the requested level. A label such as superseded quantity tells the reader that the figure is historical context only. A separate line for revised requested quantity tells the reader what to price.
This is especially relevant when a quotation has been discussed by product scope and order levels. TOP KNIVES LLC’s official contact page describes quotation support for RFQ details, price ladder communication, product matching, MOQ levels, and day-to-day buyer communication. It also lists example quantity levels such as 100 / 300 / 500 / 1000 pcs. Those examples are not a promise that every quantity is available or priced for every product; they show why a clear quantity level matters in the request.
A simple revision block to copy into your email
Use a short block at the top of the message. It does not need to be elaborate; it needs to be unambiguous.
| Field | What to write |
|---|---|
| Product reference or description | Same product reference as the RFQ, or a clear description of the item without inventing SKU details. |
| Superseded quantity | 500 pcs – historical only; do not quote this level. |
| Revised requested quantity | 300 pcs – please quote this level. |
| Prior RFQ or quotation reference | The RFQ or quotation number and date, if available. |
| Revision date | The date of this revision request. |
| Destination market | Country or port and sales channel, where relevant to the quote. |
| Packaging or customization notes | Only the requirements that affect the quotation, and whether they are unchanged or revised. |
| Requested output | A revised quotation or PI that shows the revised quantity clearly. |
Example wording that keeps the two quantities separate
Subject: Revised quantity for quotation –
Hello,
Please revise the quotation for
This wording does two jobs. It preserves the history, and it prevents the old quantity from being read as the current request. It also asks for confirmation in the revised document rather than in a separate comment.
What to include besides the quantity
Quantity is only one input. The official contact page’s pre-inquiry list asks buyers to include product type or reference SKU, target market and sales channel, quantity level, packaging or gift-box requirement, logo or customization request, sample request or approved sample standard, destination country or destination port, and platform, import, or compliance requirements. A revision request can reuse that list, with one change: label the old quantity and the new quantity separately. That helps the team match the right product route and prepare a more useful quotation without unnecessary back-and-forth.
If the revision changes more than quantity, say so explicitly. For example, if packaging changed at the same time, write ‘packaging unchanged’ or ‘packaging revised as follows.’ Otherwise the quotation team may not know whether to carry forward the old packaging assumption. The same applies to logo or customization notes and the approved sample reference.
Do not rely on ‘same as before’
‘Same as before’ is risky when the before is no longer active. The buyer may mean ‘same product, new quantity,’ while the supplier may read ‘same quotation, including the old quantity.’ Write the old figure only as a superseded reference and put the new figure on its own line. If a previous quotation exists, attach it or cite its number and date. Then ask for the revised quotation to show the revised quantity clearly.
A revised quantity is not automatically a revised price, MOQ, lead time, or availability. The official contact page notes that product availability, quotation, sample timing, packaging options, logistics route, and cooperation terms may vary by product category, quantity, destination market, and production schedule. That is why the buyer should request a fresh quotation for the new level rather than assume the earlier commercial terms still apply.
Who to contact and what to ask them to confirm
Use the official contact page as the inquiry route. The page identifies quotation support for RFQ details, price ladder communication, product matching, MOQ levels, and day-to-day buyer communication. In the message, ask the team to confirm the revised quantity, the product reference, and any changed packaging or customization points in the revised quotation or PI. If the request crosses areas such as samples or follow-up, the contact page explains that Jack can coordinate the business route internally.
TOP KNIVES LLC describes production resources in China and Vietnam and a U.S. communication role supporting international buyer communication. Those public descriptions explain the company’s coordination role; they do not establish factory ownership, SKU-specific origin, inventory, or a delivery promise for a particular order. The quotation and order documents remain the place to confirm the seller, product scope, quantity, and terms for that order.
A short pre-send checklist
- Is the old quantity labeled ‘superseded’ and marked ‘do not quote’?
- Is the revised requested quantity on its own line and easy to find?
- Did you include the product reference, prior RFQ or quotation number, and revision date?
- Did you state the destination market and any packaging or customization change?
- Did you ask for the revised quantity to be confirmed in the new quotation or PI?
- Did you avoid assuming that any earlier price, MOQ, lead time, or availability still applies?
For the actual revision request, use the official contact page. If you also need to revisit how the project brief was set up, the manufacturing capabilities page describes the brief, scope confirmation, sampling, and production-coordination route.
Sources
- TOP KNIVES LLC company and manufacturing coordination – public description of production resources in China and Vietnam and a U.S. communication role; not proof of SKU origin or inventory.
- TOP KNIVES Official Contact – official inquiry route, quotation support, quantity-level examples, and pre-inquiry checklist.
- TOP KNIVES Manufacturing Capabilities – project brief, quantity target, scope confirmation, sampling, and production-coordination descriptions.
Accessed 2026-11-13.
About this answer
Prepared with AI assistance from an approved source pack; publication is subject to deterministic editorial, canonical, sitemap, and security gates.